4.0%
Bill of quantities
One row per element. Quantity multiplies the volume.
12.48 m³ total₹1.62 L
2.81 m³ total₹45,488
2.58 m³ total₹57,241
3.95 m³ total₹49,892
Material rates
Currently using region preset. Edit any cell to override locally.
Assumptions
Tune the figures the estimator used to hide.
Swaps the cement carbon factor 0.83 → 0.45 kg CO₂/kg. Cost held the same (blended cement is similarly priced).
Formwork ratio (m² per m³)
USD rate (₹ per $)
Estimated total
₹3.14 L
21.82 m³ · ₹14,402 per m³ · 4.0% wastage included
11.83 t CO₂-eembodied carbon
Tip: a PPC/GGBS blend would cut ≈ 3.35 t CO₂.
Cost composition
- Steel₹1.45 L(46%)
- Cement₹70,440(22%)
- Labour₹31,470(10%)
- Aggregate₹27,337(9%)
- Formwork₹23,603(8%)
- Sand₹16,402(5%)
- Water₹207.73(0%)
Educational disclaimer: mix proportions are indicative design mixes held inside the IS 456 w/c and cement limits, not a mix design; steel ratios are typical site averages, not code minimums. Use the Concrete Mix Design module for grade-specific BOQ and the Section Design module for accurate steel demand on a specific section.