A state appears here only once its bye-laws have been transcribed clause by clause. A guessed setback with a plausible citation is worse than no answer at all — ask if you need one that is missing.
Four sides on their own can still hinge into plots of quite different sizes. One more figure fixes it — give whichever you have.
An approach funnel of the airport, a protected monument, or the 200 m ring around the Governor's House, Secretariat, Legislative Assembly or High Court will cap this building's height whatever its road width and FAR allow. Leave a box empty if the plot is nowhere near that feature.
Table 17 — under 360 m, nothing may be built at all
Table 18 — the transitional area
By-law 20 — nothing within 100 m; within 300 m, 7 m and no floor above the first
By-law 21 — nothing above 10 m within 200 m
Enter the plot and the building, then run the check. You’ll get the required setbacks, a drawn buildable envelope, clause-cited pass/fail checks, what the plot allows at maximum, and the sanction fee.
Get 10 free credits — no card required
Sign up to save projects, export PDFs, and access all design tools.